testbeam meetings
Hamburg info
The DESY II accelerator offers three testbeam areas. The HCAL area is '21' and is located in hall 27. Detailed description on the location can be found on the main testbeam page.
- Main testbeam areas page
- Machine Information, Positron Particle Energy
- Daily Operations Overview
- Other descriptions
Talks and plans:
- 10.2009, Erika: First Ideas about HBU testbeam plan
- 12.11.2009, Mathias: HBU AHCAL Integration Status and Outlook
- 19.11.2009, Sandra: 2nd Generation Prototype Testbeam Plan
- 23.11.2009, Mathias: AHCAL Electronics. Status and Outlook
- 01.12.2009, Mathias: AHCAL Testbeam. Synchronization and Timing
- 12.01.2010, Sandra: First High Gain Calibration Single Pixel Spektra
- 12.01.2010, Mathias: AHCAL Testbeam. Timing (Hold Scan)
- 02.02.2010, Sandra: Noise and Darkness;o>
Setup documentation
- Permanently updated documentation on the FLC Wiki: 2ndGenPrototypeDoku
- Permanently updated software (LabView) on the FLC Wiki: 2ndGenPrototypeLabView
SPIROC chip and DIF board info:
- 1st Generation:
- 2nd Generation:
HBU0-II tile mapping:
>meetings: 2nd generation prototype AHCAL at DESY II area 21 Hamburg
| 23.11.2009 | AHCAL testbeam meeting | 11 a.m. at FE conf. room, build. 2b, floor 6 |
| 01.12.2009 | AHCAL testbeam meeting | 1 p.m. at FE conf. room, build. 2b, floor 6 |
| 08.12.2009 | AHCAL testbeam meeting | 1:30 p.m. at FE conf. room, build. 2b, floor 6 |
| 15.12.2009 | AHCAL testbeam meeting | 1:30 p.m. at FE conf. room, build. 2b, floor 6 |
| 12.01.2010 | AHCAL testbeam meeting | 2 p.m. at FE conf. room, build. 2b, floor 6 |
| 19.01.2010 | AHCAL testbeam meeting | 2 p.m. at FE conf. room, build. 2b, floor 6 |
| 02.02.2010 | AHCAL testbeam meeting | 2 p.m. at FE conf. room, build. 2b, floor 6 |
| 22.03.2010 | AHCAL testbeam meeting | 3 p.m. at FLC sem. room, build. 66 |

